โ—„ 33rd Games
Cement Simulator ยท After Hours

POUR DECISIONS

Clocked out. Still pouring. The boss buys the materials โ€” nail the ratio.
0Slabs poured
0Passed inspection
0Best PSI

Job Spec ยท taped to the mixer

1 : 2 : 3
cement : sand : gravel  ยท  water-cement ratio 0.50
"Eyeball it and I'll have your hard hat." โ€” the engineer

The Mix ยท dial in the ratio

Loaded: โ€”0 slabs

The Lot ยท tap to pourLot 1

Spec wants 1 part cement, 2 sand, 3 gravel, and water at half the cement.